HomeCompact BOP Control Unit – Model CH-3000A

Compact BOP Control Unit – Model CH-3000A

The compact BOP control unit CH-3000A is designed to provide reliable and efficient hydraulic energy management for blowout preventer stacks and associated well control equipment. Suitable for drilling and workover operations, this unit meets API 16D standards, ensuring safe and reliable hydraulic control.

TS-052 eng.pdf

More Categories:

Features & specifications

  • Hydraulic Power Management: Produces, stores, and delivers hydraulic energy with a nominal pressure of 3000 psi (210 bar), ensuring fast and reliable control of BOP stacks.
  • Dual Pump System: Equipped with both electric and air-operated pumps for enhanced reliability and operational redundancy. The system allows independent operation of either pump.
  • Accumulator System: Includes a hydro-pneumatic accumulator unit with cylindrical accumulators connected in series to store and maintain hydraulic fluid pressure.
  • Compact Design: Space-efficient unit with a front-opening panel for easy access. The stainless-steel front panel and driller panel ensure durability in harsh environments.
  • Hydraulic Control Manifold: Features two independent hydraulic circuits for annular and ram BOPs, ensuring precise pressure regulation. Equipped with 4-way, 3-position shear seal valves with manual actuation.
  • Quick Joint Hydraulic Hoses: The unit comes with a full set of quick-connect hydraulic hoses, allowing fast and secure connections to BOP stacks.
  • Built-in Air Compressor and Tank: The control unit includes its own air compressor and air tank, reducing dependency on external air sources.
  • Remote Control Panel: Air-operated remote control panel installed on the rig floor for safe operation, featuring ATEX-certified visual and acoustic alarms for monitoring critical parameters.

Sizes and Pressure Ratings:

  • Available in accumulator configurations for 4 or 6 accumulators, each rated for 3000 psi.

Applications:

  • Drilling and Workover Operations: Ideal for managing well control in both drilling and workover operations, ensuring hydraulic energy supply to BOP stacks for safe operation.

Materials and Construction:

  • Stainless Steel Panels: The front and driller panels are constructed from corrosion-resistant stainless steel, ensuring longevity in harsh drilling environments.

Related Articles